Projects

Marriott Tri-Brand Hotel Expansion

Contractor: Craine Construction
Scope: Structis out of Nashville, TN secured the contract to apply around 7 inches of Low-Density Fill (LDF) over the existing parking deck, topped with 1 inch of Maxxon® Level-Crete.

Eagle and Phoenix Mills

Scope: 50,000 sq.ft Gyp-Crete 2000®/3.2K over Acousti-Mat® 3/4, poured at a depth of 1 1/2" - 2"

Capitol View

Contractor: HOAR Construction
Scope: 304,000 sq.ft Gyp-Crete 2000®/3.2K over Acousti-Mat® 3/8 90 Elevated balconies waterproofed and concrete poured